|
Who's Online
There currently are 6043 guests online.
|
Categories
|
Information
|
Featured Product
|
|
|
|
|
There are currently no product reviews.
;
This is a good quality scan of the Operation & Maintenance (Service) Manual for the PAL version of this high-band broadcast umatic, BVU-800P
All schematics and lineup procedures appear to be included in this one manual AFAICT.
The file size is just over 113 MB which gives an idea of the quality and number of pages.
All of the schematics, which contain some fairly small print, are easily readable when you zoom into the page.
John Thompson, Newcastle Upon Tyne, England.
;
Good quality, all schematics of few of models. There is also short form of user manual and regulation manual.
;
Perfect copy of the service manual. you can enlarge every page, and it comes up
with all details.
;
It´s very very nice manual with all, what i need. Original in good quality. Very fast business. Very much thanks...
;
Purchased the manual that I was looking for at a great price and could download it easily.. Great service experience and for future purchases I plan to use the site.
Thank you very much
1-A. Preliminary/Final Checking and Alignment of Tape Path
Purpose: To make sure that the tape path is well stabilized. Symptom of Misalignment: If the tape path is unstable, the tape will be damaged. Note: Do not use an Alignment Tape for this procedure. If the unit is not correctly aligned, the tape may be damaged. 1. Playback a blank cassette tape and check to see that the tape runs without creasing at Guide Rollers [2] and [3], and at points A and B on the lead surface. (Refer to Fig. M3 and M4.) 2. If creasing is apparent, align the height of the guide rollers by turning the top of Guide Rollers [2] and [3] with a Guide Roller Adj. Screwdriver. (Refer to Fig. M3 and M5.)
Guide Roller [2] Guide Roller [3]
3. Check to see that the tape runs without creasing at Take-up Guide Post [4] or without snaking between Guide Roller [3] and ACE Head. (Fig. M3 and M5) 4. If creasing or snaking is apparent, adjust the Tilt Adj. Screw of the ACE Head. (Fig. M6)
Azimuth Adj. Screw
ACE Head Flat Screwdriver
Tilt Adj. Screw
Fig. M6
1-B. X Value Alignment
Purpose: To obtain maximum PB FM envelope signal at the preset position of the Tracking Control Circuit, align the Horizontal Position of the ACE Head. Symptom of Misalignment: If the Horizontal Position of the ACE Head is not properly aligned, maximum PB FM envelope cannot be obtained at the preset position of the Tracking Control Circuit. 1. Connect the oscilloscope to TP (C-PB and CTL) on the Main CBA. Use TP (RF-SW) as a trigger. 2. Playback the Gray Scale of the Alignment Tape (FL8N --- 2 head model, FL8NW --- 4 head model) and confirm that the PB FM signal is present. 3. Set the Tracking Control Circuit to the preset position by pressing CH UP button on the remote control unit then �PLAY� button on the unit. (Refer to note on bottom of page 2-3-4.)
ACE Head
A
B Take-up Guide Post [4]
Fig. M3
Lead Surface of Cylinder
Tape
Fig. M4
4. Use the Flat Screwdriver so that the PB FM signal at TP (C-PB) is maximum. (Fig. M6)
Correct
Guide Roller Tape
Incorrect
Tape
Take-up Guide Post
Fig. M5
2-3-3
U29NMA_FC
|
|
|
> |
|